Turnkey commissioning is completed within 72 hours of site placement provided standard site conditions are satisfied.
- Client Site Responsibilities: The client is solely responsible for ensuring the placement location provides stable, level bearing capacity (compacted engineered gravel pad, helical ground screws, or reinforced concrete slab). Utility connection endpoints (50A 120/240V RV hookup, 3/4″ pressurized potable water inlet, and 3″ sewer/septic drain) must be installed within 25 feet of the planned chassis hitch.
- Freight & Crane Clearances: Access roads to the installation location must accommodate standard heavy-duty flatbed semi-trailers (minimum 14 ft vertical clearance and 12 ft lane width). Excessive tree trimming, municipal street-closure permits, or high-tonnage telescopic crane requirements beyond standard 50-ton rigging are the client’s logistical obligation.